"Catching the color" or copper-matte or

I'm bleeding. It turns out that at last, after tuning and tempering furnaces for baking bricks for the oven bottle, after enduring the smoke that left us with red eyes when the sawdust bricks began to catch fire (this was when we played approx. 300 ° C) and had to turn off the oven because it was impossible that the school continue to give the other classes, we let Tuesday the final spongy, bright and early and without students taking courses for which they suffered no smoke again.
the end, there was no smoke (had already burned all of last Thursday). I arrived that day after work at about 15 pm. (We took turns between students and Marta, the teacher was the one that was from start to finish), and was about 700 degrees C, but had seen the gas furnace in operation, had never made a baked into it and I loved the issue of control air nozzle, constantly looking burners, gas pressure, the opening of the run ... was a good experience, which included a burner off accidentally while to the temple and therefore take all precautions for the restart, allow it to ventilate the oven in case of gas that has accumulated inside (they were two seconds) but we did everything as if we had not seen when turned off, practice and memorize them again and again closing the key steps in case of emergency, including power outages. With these bugs bigs not be neglected.
Long before we had anticipated, at 18:40 fell on top cone indicating that it had reached 1200 ° C. At 19:00 hs. lower cone fell off and proceeded to complete the oven.










I

awards they were placed in a small oven and walkways almost pressure, stacked one over another. we should have grabbed a bigger oven and place the army leadership to cook supported by all sides concerned, in the same manner as is allowed to dry. We did and we paid a heavy price for not doing so.

do now return to the top again. Agggggg! two months waiting to dry! and above us December grabs! Well, in March will put his hand again. I know it's not for my oven, is for school, but we put so much grip as if to us and we were doing to the yard of our house! Aaaggggg!. This dome
broke, let's see if we can at least patch up and stick with refractory cement, but I have my doubts as to withstand the heat without breaking down or split again, but at least we make a batch before December.
Trial and error. Trial and error. I have no consolation.



same, and begin to level the floor where they place the oven and produce bricks that will form the floor. The show must go on.